Classroom:
|
|
Type
general classroom
|
|
Capacity
46
|
|
Student Seating
moveable tablet armchairs
|
Writing Surface(s)
chalkboard(s) |
Facilities Help: |
|
John Robinson 49 Lynch Laboratories lifesci-facilities@sas.upenn.edu 215-746-2699 |
Technology Help: |
|
Biology Computing Support 217 Leidy Laboratories bio-computing@sas.upenn.edu 215-898-4947 |
|
Click on picture to enlarge
Pictures updated September 2018
The equipment listed below is permanently installed in Leidy Laboratories 109:
- centralized control of audiovisual system
• control touch panel/cable cubby on top of podium
- 1 installed video projector
- recommended display resolution is 1920 x 1080 at 60Hz
- electronically operated projection screen is controlled:
• by turning the system on or off
• using the controls on the touch panel
• using the wall-mounted switch
- computer with Macintosh OS operating system
• please note that there is no optical drive attached to this computer
- VGA and HDMI inputs to attach laptop computer to the projection/audio systems
• please note that laptop users may need to provide an adapter to use this feature
• please note that laptop Internet connectivity is available via AirPennNet only
- Blu-ray™ player
- high-density wireless Internet access (AirPennNet)
Additional technology information about Leidy Laboratories 109:
- CD playback is available using the Blu-ray™ player.
- Region-free DVD playback is available using the Blu-ray™ player.
What's green in Leidy Laboratories 109:
|
The projector in this classroom will shut down automatically after 30 minutes of inactivity as measured by seating area vacancy sensors.
|
|
The projector in this classroom uses an alternate light source in lieu of traditional lamps.
|
|
|
Access to Leidy Laboratories 109 is restricted. Please note that the doors to this classroom are scheduled to lock automatically on a daily basis.
|
|
|
Join us in reducing Penn's carbon footprint by using the classroom controls to turn off the projector at the end of your class/event. You'll save energy and help us save money by extending the life of the audiovisual system components.
|
|
Project information about Leidy Laboratories 109:
Ten Year Project History:
|
Description of Work |
|
Status |
|
Year |
|
technology upgrade |
|
completed |
|
2018 |
|
SAS HVAC project support |
|
completed |
|
2017 |
|
projector replacement |
|
completed |
|
2015 |
|
|
Page updated on 6 August 2018