Classroom:
|
|
Type
general classroom
|
|
Capacity
25
|
|
Student Seating
moveable tablet armchairs
|
Writing Surface(s)
chalkboard(s) |
Facilities Help: |
|
Mary Nixon 105 Perelman Center for Political Science and Economics williams-facilities@sas.upenn.edu 215-898-4188 |
Technology Help: |
|
Williams Hall IT Support 433 Williams Hall williams-classrooms@sas.upenn.edu 215-898-4947 |
|
Click on picture to enlarge
Pictures updated September 2023
The equipment listed below is permanently installed in Williams Hall 201:
- centralized control of audiovisual system
• control touch panel on top of podium
- 1 installed video projector
- recommended display resolution is 1920 x 1080 at 60Hz
- manually operated projection screen
- computer with Windows™ operating system
• please note that there is no optical drive attached to this computer
- VGA and HDMI inputs to attach laptop computer to the projection/audio systems
• please note that laptop users may need to provide an adapter to use this feature
• please note that laptop Internet connectivity is available via AirPennNet only
- Blu-ray™ player
- overhead projector available from LSP upon request
- high-density wireless Internet access (AirPennNet)
Additional technology information about Williams Hall 201:
- CD playback is available using the Blu-ray™ player.
- Region-free DVD playback is available using the Blu-ray™ player.
What's green in Williams Hall 201:
 |
The projector in this classroom will shut down automatically after 30 minutes of inactivity as measured by seating area vacancy sensors.
|
 |
The projector in this classroom uses an alternate light source in lieu of traditional lamps.
|
|
|
Join us in reducing Penn's carbon footprint by using the classroom controls to turn off the projector at the end of your class/event. You'll save energy and help us save money by extending the life of the audiovisual system components.
|
|
Project information about Williams Hall 201:
Ten Year Project History:
|
Description of Work |
|
Status |
|
Year |
|
support for facilities and technology preparations for Fall 2020 Term (COVID-19) |
|
completed |
|
2020 |
|
projector replacement |
|
completed |
|
2018 |
|
technology upgrade |
|
completed |
|
2014 |
|
|
Page updated on 7 January 2022