Click on picture to enlarge
Pictures updated September 2019
The equipment listed below is permanently installed in Meyerson Hall B4:
- centralized control of audiovisual system
• control touch panel/cable cubby on top of podium
- 1 installed video projector
- recommended display resolution is 1920 x 1080 at 60Hz
- electronically operated projection screen is controlled:
• by turning the system on or off
• using the controls on the touch panel
• using the wall-mounted switch
- computer with Windows™ operating system
- VGA and HDMI inputs to attach laptop computer to the projection/audio systems
• please note that laptop users may need to provide an adapter to use this feature
• please note that laptop Internet connectivity is available via AirPennNet only
- Blu-ray™ player
- overhead projector available from LSP upon request
- high-density wireless Internet access (AirPennNet)
Additional technology information about Meyerson Hall B4:
- CD playback is available using the computer/laptop optical drive and/or the Blu-ray™ player.
- Region-free DVD playback is available using the Blu-ray™ player.
- DVD playback is also available using the computer/laptop optical drive.
What's green in Meyerson Hall B4:
 |
The lighting system in this classroom uses LED technology.
|
 |
The projector in this classroom will shut down automatically after 30 minutes of inactivity as measured by seating area vacancy sensors.
|
 |
The projector in this classroom uses an alternate light source in lieu of traditional lamps.
|
|
|
Access to Meyerson Hall B4 is restricted. Please note that the door to this classroom is scheduled to lock automatically on a daily basis.
|
|
|
Join us in reducing Penn's carbon footprint by using the classroom controls to turn off the projector at the end of your class/event. You'll save energy and help us save money by extending the life of the audiovisual system components.
|
|
Project information about Meyerson Hall B4:
Ten Year Project History:
|
Description of Work |
|
Status |
|
Year |
|
support for School of Design robotics project |
|
completed |
|
2020 |
|
projector replacement |
|
completed |
|
2019 |
|
classroom renovation |
|
completed |
|
2018 |
|
lighting system repair |
|
completed |
|
2017 |
|
Design HVAC project |
|
completed |
|
2016 |
|
Design HVAC project |
|
completed |
|
2015 |
|
technology upgrade |
|
completed |
|
2015 |
|
|
Page updated on 7 July 2015