Classroom:
|
|
Type
seminar room
|
|
Capacity
24 in room (total) 15 student seats at table
|
|
Student Seating
conference table and moveable seating electrical outlets at student seats
|
Writing Surface(s)
chalkboard(s) |
Facilities Help: |
|
Mary Nixon 105 Perelman Center for Political Science and Economics cohen-facilities@sas.upenn.edu 215-898-4188 |
Technology Help: |
|
Cohen Hall IT Support 468 Claudia Cohen Hall cohen-classrooms@sas.upenn.edu 215-898-4947 |
|
Click on picture to enlarge
Pictures updated January 2017
The equipment listed below is permanently installed in Claudia Cohen Hall 203:
- centralized control of audiovisual system
• control touch panel/cable cubby at east end of table
- 1 installed video projector
- recommended display resolution is 1920 x 1080 at 60Hz
• please note that display images from the installed computer are viewable on the projection screen only
- manually operated projection screen
- computer with Windows™ operating system
• please note that there is no optical drive attached to this computer
- VGA and HDMI inputs to attach laptop computer to the projection/audio systems
• please note that laptop users may need to provide an adapter to use this feature
• please note that laptop Internet connectivity is available via AirPennNet only
- Blu-ray™ player
- overhead projector available from LSP upon request
- high-density wireless Internet access (AirPennNet)
Additional technology information about Claudia Cohen Hall 203:
- CD playback is available using the Blu-ray™ player.
- Region-free DVD playback is available using the Blu-ray™ player.
What's green in Claudia Cohen Hall 203:
|
The lighting system in this classroom uses LED technology.
|
|
The projector in this classroom will shut down automatically after 30 minutes of inactivity as measured by seating area vacancy sensors.
|
|
The projector in this classroom uses an alternate light source in lieu of traditional lamps.
|
|
|
Join us in reducing Penn's carbon footprint by using the classroom controls to turn off the projector at the end of your class/event. You'll save energy and help us save money by extending the life of the audiovisual system components.
|
|
Project information about Claudia Cohen Hall 203:
Ten Year Project History:
|
Description of Work |
|
Status |
|
Year |
|
technology upgrade |
|
completed |
|
2020 |
|
elevator project support |
|
completed |
|
2018 |
|
|
Page updated on 8 October 2020