Classroom:
|
|
Type
general classroom
|
|
Capacity
32
|
|
Student Seating
moveable tablet armchairs
|
Writing Surface(s)
chalkboard(s) |
Facilities Help: |
|
James Trumbo 123 Fisher-Bennett Hall fbh-facilities@sas.upenn.edu 215-746-3526 |
Technology Help: |
|
Fisher-Bennett IT Support 232 Fisher-Bennett Hall fbh-classrooms@sas.upenn.edu 215-898-4947 |
|
Click on picture to enlarge
Pictures updated February 2017
The equipment listed below is permanently installed in Fisher-Bennett Hall 013:
- centralized control of audiovisual system
• control touch panel/cable cubby in instructor table
- 1 installed video projector
- recommended display resolution is 1920 x 1080 at 60Hz
- manually operated projection screen
- computer with Windows™ operating system
• please note that there is no optical drive attached to this computer
- VGA and HDMI inputs to attach laptop computer to the projection/audio systems
• please note that laptop users may need to provide an adapter to use this feature
• please note that laptop Internet connectivity is available via AirPennNet only
- Blu-ray™ player
- overhead projector available from LSP upon request
- high-density wireless Internet access (AirPennNet)
Additional technology information about Fisher-Bennett Hall 013:
- CD playback is available using the Blu-ray™ player.
- Region-free DVD playback is available using the Blu-ray™ player.
Additional facilities information about Fisher-Bennett Hall 013:
- The height of the instructor's table in this classroom is adjustable.
What's green in Fisher-Bennett Hall 013:
|
The projector in this classroom will shut down automatically after 30 minutes of inactivity as measured by seating area vacancy sensors.
|
|
The projector in this classroom uses an alternate light source in lieu of traditional lamps.
|
|
|
Join us in reducing Penn's carbon footprint by using the classroom controls to turn off the projector at the end of your class/event. You'll save energy and help us save money by extending the life of the audiovisual system components.
|
|
Project information about Fisher-Bennett Hall 013:
Ten Year Project History:
|
Description of Work |
|
Status |
|
Year |
|
technology upgrade |
|
completed |
|
2020 |
|
|
Page updated on 8 October 2020